Afon Engineering Swansea Factory Construction

The regeneration of the site and the build of the new 8000 sq metre factory construction was completed by Crynant Plant ltd. The project included the demolition of a large redundant unit along with the segregation and disposal of materials on site in a tight time schedule in order for the pilling of the new factory to be undertaken. The factory build included the installation of bases for high precision machinery along with 6 new 10 tonne gantry overhead cranes.